1. Clean the floor before installing the solid wood floor, because the dust on the ground is not clean, it will have a great influence on the effect of the later laying. Determine the concrete laying direction of solid wood flooring: Normally,Wood-Plastic Composite Deck And Fence for the south-facing rooms, the main north-south direction is used for paving, that is, from south to north, facing in the direction of sunlight.
2, the laying of solid wood floor playing keel: solid wood flooring keel should be four-planed, and then drying treatment; Keel level must be flat,Composite Landscape Timbers For Garden the keel must be fixed, its fixed must use special keel nails. The ground can be sprinkled with some insect-proof and moisture-proof materials, such as alder blocks.
3, the next paved moisture mat: the use of 1.5 thick moisture-proof mat, can isolate the ground moisture, to avoid the daily use of floor due to ground moisture and deformation and so on. Then the floor is pre-paved: through pre-paving,Long House Plans With Roof Top Deck the effect of color difference on the pavement effect can be reduced, and some situations with large flowers and large contrasts can be avoided. For some appearances,Garden Wood Screening Detail it can be laid to the bottom of the bed or the bottom of the cabinet.
4. Steps for installing the floor: nails for installing the floor must use nails for the floor, and can not be directly driven into the floor. After the drill is drilled, the floor is used to fix the wooden floor to the keel. Reserving gaps: Note that in the laying of the floor,Materials Needed For A 4x8 Deck appropriate gaps should be reserved to ensure the expansion of the floor in the later period and to avoid the occurrence of arching problems.
5. Install the skirting board: After the floor is laid, with the wall surface, pass the door stone and other surrounding areas, you need to reserve 8-12 mm gap,Indoor Wall Panels Decorative Luxury to reserve space for the expansion of the floor, and to cover the gap through the installation of the skirting line. . Install the batten: the joints between the floor and the door stone, floor tiles, etc., need to use the batten or edge strip installation to cover the left seam.
2, the laying of solid wood floor playing keel: solid wood flooring keel should be four-planed, and then drying treatment; Keel level must be flat,Composite Landscape Timbers For Garden the keel must be fixed, its fixed must use special keel nails. The ground can be sprinkled with some insect-proof and moisture-proof materials, such as alder blocks.
3, the next paved moisture mat: the use of 1.5 thick moisture-proof mat, can isolate the ground moisture, to avoid the daily use of floor due to ground moisture and deformation and so on. Then the floor is pre-paved: through pre-paving,Long House Plans With Roof Top Deck the effect of color difference on the pavement effect can be reduced, and some situations with large flowers and large contrasts can be avoided. For some appearances,Garden Wood Screening Detail it can be laid to the bottom of the bed or the bottom of the cabinet.
4. Steps for installing the floor: nails for installing the floor must use nails for the floor, and can not be directly driven into the floor. After the drill is drilled, the floor is used to fix the wooden floor to the keel. Reserving gaps: Note that in the laying of the floor,Materials Needed For A 4x8 Deck appropriate gaps should be reserved to ensure the expansion of the floor in the later period and to avoid the occurrence of arching problems.
5. Install the skirting board: After the floor is laid, with the wall surface, pass the door stone and other surrounding areas, you need to reserve 8-12 mm gap,Indoor Wall Panels Decorative Luxury to reserve space for the expansion of the floor, and to cover the gap through the installation of the skirting line. . Install the batten: the joints between the floor and the door stone, floor tiles, etc., need to use the batten or edge strip installation to cover the left seam.